Network Maintenance: CENIC Maintenance
Scheduled Maintenance Report for UC Davis
Completed
The scheduled maintenance has been completed.
Posted Oct 09, 2024 - 05:00 PDT
In progress
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Oct 09, 2024 - 00:00 PDT
Scheduled
Purpose:
[CENIC NOC- 745283] CENIC engineers will be performing a software upgrade to the aggregate switches at several locations that will be impacting the sites listed. Impact is expected to be about 20mins. during the duration of the reload but the whole window is reserved.

Impact:
Loss of AWS Direct Connect path redundancy during the scheduled maintenance window.

Affected:
AWS Direct Connect via San Jose (UC Davis - DC-L2-UCDV1-SANJ1-10G-6695)

----------------------------
IT Express Service Desk
ithelp@ucdavis.edu
530.754.HELP (4357)
Posted Sep 16, 2024 - 09:32 PDT
This scheduled maintenance affected: Network, Voicemail, Voice Telephone System, and Wireless.