Network Maintenance: Davis Border Router

Scheduled Maintenance Report for UC Davis

Completed

The scheduled maintenance has been completed.
Posted May 30, 2025 - 06:00 PDT

In progress

Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted May 30, 2025 - 04:00 PDT

Scheduled

Purpose:
Migrate existing network interfaces to a new port location on the Davis Border Router.

Impact:
Reduced capacity between the Davis Border and Campus Networks when a 10GE circuit is migrated. CENIC CalREN DC service will reroute to Sacramento during the maintenance window. UC Davis Health backup 10G circuit to Davis will be unavailable during the maintenance window.

Affected Network:
128.120.0.0/16
152.79.0.0/16
168.150.0.0/17
169.237.0.0/16
2607:f810::/36

----------------------------
IT Express Service Desk
ithelp@ucdavis.edu
530.754.HELP (4357)
Posted May 27, 2025 - 12:01 PDT
This scheduled maintenance affected: Network, Voicemail, Voice Telephone System, and Wireless.