Scheduled
Purpose:
This will affect all electrical power to all 3 buildings. To replace main circuit breaker to elevators. Requested by Gerry Ownby, 4G18, BMS Electrial Shop, cell 979-1567 Reference job # 2650867 – C081 – C082 – C132.

Impact:
Data connectivity will be lost if UPS batteries are depleted.

Affected:
BUILDINGS:
E&PS SHOCKWAVE LAB
JUNGERMAN
PHYSICS
ROESLR

VLANs:
ARCH-&-ENGR-2
CROC-NUC-LAB-1
CROC-NUC-LAB-2
CROC-NUC-LAB-DMZ
CTR-COMP-SCI/EN-1
GEN-ACAD-1
GEOLOGY-1-FW
HVAC-2-FW
IDAV-CSE-2-FW
WIRELESS
PHYSICS-1-DMZ
PHYSICS-1-FW
PHYSICS-2-FW
PHYSICS-4-FW
POWER-1-NR
VC-RESEARCH-1-FW


----------------------------
IT Express Service Desk
ithelp@ucdavis.edu
530.754.HELP (4357)
Posted Jun 16, 2016 - 08:19 PDT
This scheduled maintenance affected: Network.