Network Maintenance: Telecom Building Generator Test
Scheduled Maintenance Report for UC Davis
Completed
The scheduled maintenance has been completed.
Posted Jan 25, 2018 - 06:45 PST
In progress
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Jan 25, 2018 - 05:45 PST
Scheduled
Purpose:
Performing the monthly test of the Telecom Building backup power generator.

Impact:
None expected. All power should automatically switch over to the generator power during the test.

Locations Affected:
- Campus and Resnet data networks
- Connectivity to the Internet
- Voice Services including voicemail

----------------------------
IT Express Service Desk
ithelp@ucdavis.edu
530.754.HELP (4357)
Posted Jan 19, 2018 - 16:24 PST
This scheduled maintenance affected: Network, Voice Telephone System, and Wireless.