Network Maintenance: UCDNet4 Phase 3 Cutover AGG STAD E BDF0402
Scheduled Maintenance Report for UC Davis
Completed
The scheduled maintenance has been completed.
Posted Jun 28, 2022 - 02:01 PDT
In progress
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Jun 27, 2022 - 17:01 PDT
Scheduled
Description: UCDNet4 Phase 3 Cutover AGG STAD E BDF0402

Start of Window : 06/27/2022 17:00
End of Window : 06/28/2022 02:00
(all times are in 24 hour format)

Purpose:
Cut building over from UCDNet3 to UCDNet4

Impact:
The cutover will begin during it's turn within the
maintenance window and last about 3 hours. In the beginning
phases of each building cutover, there could be several 1-2
minute outages as edge switch links are converted to use
LACP. This conversion phase could last from 30 to 90 minutes.
Once the conversions are complete, Net3 links and router
interfaces will be disabled and a link migration to Net4 will
begin. This could take between 30 to 120 minutes depending on
the size of the building. During this second phase of the
building cutover, the outage experienced could range from 5
to 120 minutes depending on switch migration order.

Affected:
BUILDINGS:
AG STAD E
AG STAD N
AG STAD W
SCHAAL OFFICES


VLANs:
BOOKSTORE-1-FW
BOOKSTORE-2
ECO-3-NR
HOUSING-7-FW
HVAC-2-FW
INTRCOL-ATHL-1-FW
INTRCOL-ATHL-3-FW
INTRCOL-ATHL-4-NR
O&M:UTILITIES-1
POWER-1-NR
WIRELESS
Posted Jun 25, 2022 - 15:16 PDT
This scheduled maintenance affected: Network and Wireless.