Planned Maintenance: UC Davis Health Stadium North/G139 Pre-Approved Electrical Utility Shutdown
Scheduled Maintenance Report for UC Davis
Completed
The scheduled maintenance has been completed.
Posted Aug 30, 2019 - 11:00 PDT
In progress
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Aug 30, 2019 - 09:00 PDT
Scheduled
Purpose: For contractor to tie into main msb.

Impact: This shutdown will affect all electrical power to the building. Generator needs to be disabled.

Affected:
BUILDINGS:
AGGIE STADIUM NORTH

VLANs:
BOOKSTORE-1-FW
INTRCOL-ATHL-1-FW
INTRCOL-ATHL-3-FW
INTRCOL-ATHL-4-NR
WIRELESS


----------------------------
IT Express Service Desk
ithelp@ucdavis.edu
530.754.HELP (4357)
Posted Aug 29, 2019 - 15:49 PDT
This scheduled maintenance affected: Network and Wireless.