Electrical Shutdown: Facilities
Scheduled Maintenance Report for UC Davis
Completed
The scheduled maintenance has been completed.
Posted Dec 18, 2014 - 10:00 PST
In progress
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Dec 18, 2014 - 09:00 PST
Scheduled
Purpose:
Utility power will be cycled to emergency generator power and back to utility power. Pre-Approved by Cynthia Kranc. The purpose is to test generator. Requested by Jose Marroquin, Utilities High Voltage, cell 400-5662. Reference job # 2533443 - C Zones.

Impact:
Data connectivity will be lost once UPS batteries are depleted.

Buildings:
FAC MECH
FAC RECVG
FAC SERVICES
FAC SHOPS
FAC STRC TR

VLANs:
HOUSING-1-FW
HVAC-1-FW
HVAC-2-FW
MOOBILENET(X)
O&M:UTILITIES-1
PHYS-PLANT-1-FW
PHYS-PLANT-2-FW
PHYS-PLANT-3-FW
PHYS-PLANT-4-FW
PHYS-PLANT-5-FW
PHYS-PLANT-6-FW
WASTEWATER-1-FW


----------------------------
IT Express Service Desk
ithelp@ucdavis.edu
530.754.HELP (4357)
Posted Dec 08, 2014 - 14:56 PST
This scheduled maintenance affected: Network.