Scheduled
Purpose:
This will affect all electrical power. H205-H206-H207-H208 will have no power from 7:00am to 8:00am then will be on normal power until 4:00pm then will be off until 5:00pm then back to on to normal power. Removal of trees around high voltage lines. Requested by George Jones, Utilities High Voltage, 681-7318. Reference job #2521854- H Zones.

Impact:
Data connectivity will be lost once UPS batteries are depleted.

Buildings:
LEUKEMIA LAB

VLANs:
HVAC-2-FW
VM-RESEARCH-1-FW


----------------------------
IT Express Service Desk
ithelp@ucdavis.edu
530.754.HELP (4357)
Posted Oct 29, 2014 - 08:36 PDT
This scheduled maintenance affected: Network.