Purpose:
Performing the monthly test of the Telecom Building backup power generator.

Impact:
None expected. All power should automatically switch over to the generator power during the test.

Affected:
- Campus and Resnet data networks
- Connectivity to the Internet
- Voice services including voicemail

Locations Affected:

----------------------------
IT Express Service Desk