Planned Maintenance: Repairs to voice network feeder cable that services buildings west of Hwy 113.
Scheduled Maintenance Report for UC Davis
Completed
Maintenance to this portion of the voice network feeder cable has been completed.
Posted Feb 23, 2016 - 11:15 PST
Update
Work is scheduled to continue through Friday February 12th.
Posted Feb 04, 2016 - 12:25 PST
In progress
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Jan 14, 2016 - 08:00 PST
Scheduled
Purpose: Repairs will be conducted on the copper feeder cable that provides voice network service to multiple buildings west of Hwy 113. During this time voice network traffic to and from these locations may experience degraded service.

Impact: The list of buildings are as follows:

4967 (WV CENTER)
4968 (WV LRCC)
4962-K026 (VIRIDIAN 5)
7707-R (BOOSTER TANK & PUMP #2)
4705-K001 (WEST VILLAGE TRAILER #1)
4881-S048 (CNPRC CEF)
LCCB-L999 (X-CONN BOX-04 HOPKINS/BEE)
4252-N027 (TB 160)
4711-L037 (WST CTR AGEQ)
4911-L041 (LIFT STAT 12)
3762-L003 (VEG STORE)
4711-L037 (WST CTR AGEQ)
4457-N031 (VEG FLD HQ C)
4192-N024 (AGRON FLDLAB)
4019-L008 (WEATHER STA)
3765-L006 (WS&E FLB)
4209-L028 (WELL E4A)
3469-L004 (TB 12)


----------------------------
IT Express Service Desk
ithelp@ucdavis.edu
530.754.HELP (4357)
Posted Jan 13, 2016 - 09:21 PST
This scheduled maintenance affected: Voice Telephone System.